Wednesday 30 May 2012

Renewable Generation can be via a number of sources:

•Wind Turbines / Wind Farms
•Hydro electric / Tidal schemes
•Biomass CHP generation
•Anaerobic Digestion
•Solar Photo Voltaic


http://www.g2energy.co.uk/

Wednesday 23 May 2012

To date we have connected in excess of 20MW of generation to the grid including large scale solar PV schemes and Medium Wind Turbines. See our Latest Projects section for more information.

http://www.g2energy.co.uk/

Tuesday 15 May 2012

G2 Energy are involved at the Wind Turbine Open Day, on the, 15th of May. Come and see us at stand D99! http://www.g2energy.co.uk/

Wednesday 9 May 2012

INVITATION 500kW Wind Turbine

INVITATION
500kW Wind Turbine
Open Day
INVITATION
500kW Wind Turbine
Open Day
Tuesday 15th May 2012 - 10am to 4pm

Kirkburn Grange, Garton on the Wolds, Driffield

(By Kind Permission of J K B Megginson & Sons)


About the day

Andrew and Simon Megginson recently
erected a 500kW EWT Wind Turbine on
their land near Garton on the Wolds in
East Yorkshire.

As part of the launch they will be holding
an open day on 15th May 2012 and we
would like to invite you along to see it up
close and gather information from the
“horse’s mouth”. You are welcome any
time between 10am and 4pm on the day.

We will be joined on the day by a number
of representatives from other companies,
which have all formed part of the
successful installation, commissioning,
financing and on-going management of
the turbine.

The opposite page shows which
companies will be in attendance and how
they each contributed towards the
successful completion of this project.

The Open Day will be held at:

Kirkburn Grange,
Driffield, East Yorkshire,
YO25 9LP.

Between 10.00am – 4.00pm on 15th May.

Please do feel free to ask other colleagues or friends you feel may be interested
in attending this event.

Bacon sarnies, tea and coffee are available all day.


Companies involved
in the process:

“Independent advice for entire

project, providing project

management, planning, funding,

valuation and trading structure”

“Design and Build of all the Electrical
and Civil balance of plant works”


“Direct drive turbine manufacturer,
logistics, erection / commissioning,
operations and maintenance
provider”

“Provided all the legal advice on both
the turbine purchase contract and
balance of plant contract, along with
all necessary lending documentation”

“Financing for the entire project on a

flexible arrangement to suit the

needs of the client”

“Provided comprehensive insurance
coverage during the construction
and operational phases of the
contract, including ‘all risks’ of
damage including plant breakdown
to the turbine itself and loss of
income”



Directions to the open day

SAT NAV’s - enter postcode YO25 9LP

Travelling east along the A166 into Garton on the Wolds:

1. Travel through Garton and take a right hand turn onto Station Road.
2. Take the first right, past the row of cottages and next left to Kirkburn Grange.
3. Follow the road past Kirkburn Grange on your right.
4. You will see the turbine on the right once you pass through the trees.
5. Follow the track and parking will be signposted.
From Kirkburn end of Station Road

1.
Take the second left turn off station road onto the single track road up to
Kirkburn Grange passed the cottages.
2.
Follow the above directions from step 3.
Please note there will be no access through Kirkburn or Kirkburn Manor, the
postcode (YO25 9LP) will take you to a row of cottages. Site marked with a red
box on the plan below.

Wednesday 2 May 2012

As a Lloyds registered Independent Connection Provider (ICP), we may be able to provide you with a cost effective alternative to any quote you may have received from the local Distribution Network Operator (DNO)


http://www.g2energy.co.uk/